An distills these changes into checklists and flowcharts—something the raw FIDIC Red Book (running 400+ pages) does not provide.
: The Engineer’s role is now more structured, requiring a formal consultation and determination process under Sub-Clause 3.7 (Red/Yellow) or 3.5 (Silver). FIDIC 1999 vs 2017: Key contractual changes revisited fidic 2017 a practical legal guide pdf updated